- HOME
- OUR TOWN
- GOVERNMENT
- DEPARTMENTS
- DOCUMENTS & FORMS
- Meeting Agendas
- Meeting Minutes
- Municipal Code
- Public Notices
- Request For Proposals
- Comprehensive Plan
- Comprehesive Land Use Map
- Transportation Plan
- Standards & Specifications
- Emergency Operations Plan
- Fee Schedules & Utility Rates
- 2010 Budget
- CDPHE -Drinking Water CCR
- Land Development Code Revision
- RESIDENTS
- BUSINESS
- PUBLIC SAFETY
- UTILITIES
Transportation Plan
In 2003, the town adopted a set of goals and objectives to achieve their desired vision: “The Town of Hudson strives to grow and attain a population level that maintains its small town character yet provides services and amenities to improve its quality of life.”
Those relating to transportation include: 1) Complete asphalt paving and drainage improvements on local residential streets…; 2) Install better traffic channelization downtown to improve traffic safety; 3) Investigate the possible use of traffic calming devices…; 4) Increase the use of speed limit signs in neighborhoods. However, additional issues will need to be studied, to achieve the desired land use plan. Based on this, and after meeting with key town officials, we see the following as goals and objectives for this transportation plan:
Goal:
Develop a plan for an effective, multi-modal transportation system that maintains or improves the quality of life for town residents, and supports 10-year land use plans.
Objective #1:
Upgrade roads to meet accepted design standards and guidelines for designated road classifications
Objective #2:
Establish and meet Level of Service standards for projected 10-year future growth
Objective #3:
Improve traffic safety – particularly in residential neighborhoods
Objective #4:
Improve access to and within the town
Objective #5:
Minimize adverse impacts of the railroad
Objective #6:
Provide desired pedestrian, bicycle and transit facilities
Objective #7:
Minimize truck impacts
Objective #8:
Minimize unnecessary travel through and within the town
Objective #9:
Assess and propose funding methods for the needed improvements
| Attachment | Size |
|---|---|
| Hudson Transportation Plan - November 2008.pdf | 8.39 MB |
